Title :
Commissioning and on-line testing of GIS and GIL
Author :
Gross, Detlev W. ; Soller, Markus
Author_Institution :
Power Diagnostix Syst. GmbH, Aachen, Germany
Abstract :
Partial discharge measurements are used to validate the integrity of the insulation system when commissioning gas-insulated switchgear and lines (GIS, GIL). On the other hand, an increasing population of service aged GIS equipment has reached its originally projected lifetime. On-line partial discharge measurements utilizing acoustic as well as UHF sensors help keeping such equipment in service. External ring antennas, window sensors, or embedded sensors allow survey type measurements and monitoring of the partial discharge activity in the UHF range. Acoustic measurements offer excellent sensitivity with so-called bouncing particles. Field experience applying a compact instrument that combines the application of UHF and ultrasonic measurements is presented.
Keywords :
UHF detectors; gas insulated switchgear; gas insulated transmission lines; insulation testing; intelligent sensors; partial discharge measurement; ultrasonic measurement; GIS; UHF sensors; acoustic measurements; acoustic sensors; embedded sensors; external ring antennas; gas-insulated switchgear; gas-insulated transmission lines; insulation system; on-line partial discharge measurements; on-line testing; ultrasonic measurements; window sensors; Acoustic measurements; Acoustic sensors; Antenna measurements; Gas insulated transmission lines; Gas insulation; Geographic Information Systems; Partial discharge measurement; Testing; UHF measurements; Ultrasonic variables measurement;
Conference_Titel :
Electrical Insulation, 2004. Conference Record of the 2004 IEEE International Symposium on
Print_ISBN :
0-7803-8447-4
DOI :
10.1109/ELINSL.2004.1380554