DocumentCode :
2317496
Title :
Notice of Violation of IEEE Publication Principles
On-line insulation diagnostic system and off-line PD monitoring with HVAC testing
Author :
Choi, Yong-Sung ; Yun, Ju-Ho ; Lee, Kyung-Sup
Author_Institution :
Dept. of Electr. Eng., Dongshin Univ., Naju
fYear :
2008
fDate :
21-24 April 2008
Firstpage :
85
Lastpage :
88
Abstract :
Notice of Violation of IEEE Publication Principles

"On-line Insulation Diagnostic System and Off-line PD Monitoring with HVAC Testing,"
by Yong-Sung Choi; Ju-Ho Yun; Kyung-Sup Lee,
in the Proceedings of the 2008 International Conference on Condition Monitoring and Diagnosis, 21-24 April 2008, pp 85 - 88

After careful and considered review of the content and authorship of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE\´s Publication Principles.

This paper is a near duplication of the original text from the papers cited below. The original text was copied without attribution and without permission.

Due to the nature of this violation, reasonable effort should be made to remove all past references to this paper, and future references should be made to the following articles:

"What to Do After the Warning of an On-line Insulation Diagnostic System? Off-line PD Monitoring with HVAC Testing!"
by Kubler, B.; Hauschild, W,
in the Proceedings of the 2004 Power Systems Conference and Exposition, 10-13 Oct. 2004, vol. 2, pp. 822 - 828The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.
Keywords :
HVAC; partial discharge measurement; HVAC testing; alternating voltage; cable systems; electric power equipment; frequency tuned resonant test systems; off-line partial discharge monitoring; on-line insulation diagnostic system; power transformers; Cable; Frequency tuned resonant; High voltage withstand; Off-line PD monitoring; On-line insulation diagnostic;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Condition Monitoring and Diagnosis, 2008. CMD 2008. International Conference on
Conference_Location :
Beijing
Print_ISBN :
978-1-4244-1621-9
Electronic_ISBN :
978-1-4244-1622-6
Type :
conf
DOI :
10.1109/CMD.2008.4580236
Filename :
4580236
Link To Document :
بازگشت