• DocumentCode
    2317982
  • Title

    Rescheduling after inserting the buffer in the critical chain scheduling

  • Author

    Cui, Nanfang ; Tian, Wendi ; Bie, Li

  • Author_Institution
    Sch. of Manage., HuaZhong Univ. of Sci. & Technol., Wuhan, China
  • Volume
    2
  • fYear
    2010
  • fDate
    9-10 Jan. 2010
  • Firstpage
    1105
  • Lastpage
    1110
  • Abstract
    Critical chain project management, proposed by Goldratt, has proven to be a good methodology to schedule the resource-constrained projects in the past decades. Buffer management is one of the main features of the CCPM. There are a lot of researches about the buffer size methods, however not so much on the rescheduling after inserting the buffer. AS we know, there might be resource or precedence conflict after inserting the feeding buffer. It is the objective of this paper to introduce how to reschedule after inserting the buffer in the project. We propose two reschedule methodologies-local repaired reschedule and global reschedule to solve the resource and precedence contentions and some computation results are provided to compare those methodologies.
  • Keywords
    project management; scheduling; buffer management; critical chain project management; critical chain scheduling; feeding buffer; resource-constrained projects; Books; Constraint theory; Internet; Project management; Read only memory; Resource management; Robust control; Safety; Scheduling; Technology management; Buffer; Critical Chain Project Management (CCPM); Rescheduling; Theory of Constraints (TOC);
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Logistics Systems and Intelligent Management, 2010 International Conference on
  • Conference_Location
    Harbin
  • Print_ISBN
    978-1-4244-7331-1
  • Type

    conf

  • DOI
    10.1109/ICLSIM.2010.5461129
  • Filename
    5461129