• DocumentCode
    2318419
  • Title

    The application of PCA-fuzzy probability analysis on risk evaluation of construction schedule of highway

  • Author

    Xia, Liming ; Zhao, Chunxue

  • Author_Institution
    Sch. of Manage., Tianjin Univ. of Technol., Tianjin, China
  • Volume
    2
  • fYear
    2010
  • fDate
    9-10 Jan. 2010
  • Firstpage
    1230
  • Lastpage
    1234
  • Abstract
    Firstly, through the analysis of the life cycle of a highway project, this paper identified risks influencing construction schedule which set up a foundation for further establishment of a risk index system. Secondly, based on the established risk index system, this paper calculated and evaluated indicators of risks identified through probability analysis and fuzzy logic methods which became simpler after adoption of principal component analysis (PCA). Finally, the PCA-fuzzy probability analysis method is proved feasible and practicable by case study.
  • Keywords
    fuzzy logic; principal component analysis; probability; risk analysis; road building; PCA-fuzzy probability analysis; foundation; fuzzy logic; highway construction schedule; highway project; principal component analysis; risk evaluation; risk index system; Equations; Fault diagnosis; Fuzzy logic; Principal component analysis; Project management; Risk analysis; Risk management; Road transportation; Scheduling; Technology management; Construction Schedule; Fuzzy Logic Method; Highway Projects; Principal Component Analysis; Probability Analysis; Risk Index System;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Logistics Systems and Intelligent Management, 2010 International Conference on
  • Conference_Location
    Harbin
  • Print_ISBN
    978-1-4244-7331-1
  • Type

    conf

  • DOI
    10.1109/ICLSIM.2010.5461157
  • Filename
    5461157