DocumentCode
2321993
Title
On-site condition monitoring of HV power cables up to 150kV
Author
Gulski, E. ; Cichecki, P. ; Smit, J.J. ; Seitz, P.P. ; Quak, B. ; de Vries, F.
Author_Institution
Delft Univ. of Technol., Delft
fYear
2008
fDate
21-24 April 2008
Firstpage
1199
Lastpage
1202
Abstract
For advanced, non-destructive on-site condition monitoring of HV power cables up to 150 kV by partial discharge detection and dielectric losses measurement it is necessary to energize the disconnected cable system. One of the methods available for this purpose is based on applying damped AC voltages up to 150 kV. In this contribution, the use of modern technological solutions in power electronics and signal processing as well as in technical design and production methods will be discussed on the basis of ultra light system which is able to on-site service aged HV cables.
Keywords
condition monitoring; dielectric loss measurement; nondestructive testing; partial discharges; power cable testing; condition monitoring; dielectric losses measurement; high-voltage power cables; non-destructive on-site testing; partial discharge detection; Condition monitoring; Dielectric loss measurement; Dielectric losses; Dielectric measurements; Energy measurement; Loss measurement; Partial discharge measurement; Partial discharges; Power cables; Power measurement; HV power cables; PD site localization; condition monitoring; diagnosis; dielectric losses; on-site testing; partial discharges;
fLanguage
English
Publisher
ieee
Conference_Titel
Condition Monitoring and Diagnosis, 2008. CMD 2008. International Conference on
Conference_Location
Beijing
Print_ISBN
978-1-4244-1621-9
Electronic_ISBN
978-1-4244-1622-6
Type
conf
DOI
10.1109/CMD.2008.4580503
Filename
4580503
Link To Document