• DocumentCode
    2321993
  • Title

    On-site condition monitoring of HV power cables up to 150kV

  • Author

    Gulski, E. ; Cichecki, P. ; Smit, J.J. ; Seitz, P.P. ; Quak, B. ; de Vries, F.

  • Author_Institution
    Delft Univ. of Technol., Delft
  • fYear
    2008
  • fDate
    21-24 April 2008
  • Firstpage
    1199
  • Lastpage
    1202
  • Abstract
    For advanced, non-destructive on-site condition monitoring of HV power cables up to 150 kV by partial discharge detection and dielectric losses measurement it is necessary to energize the disconnected cable system. One of the methods available for this purpose is based on applying damped AC voltages up to 150 kV. In this contribution, the use of modern technological solutions in power electronics and signal processing as well as in technical design and production methods will be discussed on the basis of ultra light system which is able to on-site service aged HV cables.
  • Keywords
    condition monitoring; dielectric loss measurement; nondestructive testing; partial discharges; power cable testing; condition monitoring; dielectric losses measurement; high-voltage power cables; non-destructive on-site testing; partial discharge detection; Condition monitoring; Dielectric loss measurement; Dielectric losses; Dielectric measurements; Energy measurement; Loss measurement; Partial discharge measurement; Partial discharges; Power cables; Power measurement; HV power cables; PD site localization; condition monitoring; diagnosis; dielectric losses; on-site testing; partial discharges;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Condition Monitoring and Diagnosis, 2008. CMD 2008. International Conference on
  • Conference_Location
    Beijing
  • Print_ISBN
    978-1-4244-1621-9
  • Electronic_ISBN
    978-1-4244-1622-6
  • Type

    conf

  • DOI
    10.1109/CMD.2008.4580503
  • Filename
    4580503