Abstract
Central Iowa Power (CIPCO) has been rebuilding and upgrading approximately 30 miles of 34.5 kV lines each year since 1987. CIPCO´s service territory has a rich history of damaging ice and wind storms. T2 ACSR conductors have been used on much of the construction in an effort to reduce or eliminate the damage. Many lessons have been learned about the use of T2 conductor, specifically in the areas of design, purchasing, associated hardware, installation, and long-term performance
Keywords
aluminium; ice; overhead line conductors; power overhead lines; power transmission lines; purchasing; steel; wind; 34.5 kV; Central Iowa Power; T2 ACSR conductors; aluminium conductor steel reinforced; associated hardware; design; ice damage; ice storms; long-term performance; purchasing; wind damage; wind storms; Cable insulation; Conductors; Frequency; Ice; Porcelain; Spine; Storms; Transmission lines; Wind; Wires;
fLanguage
English
Publisher
ieee
Conference_Titel
Rural Electric Power Conference, 1997. Papers Presented at the 41st Annual Conference
Conference_Location
Minneapolis, MN
Print_ISBN
0-7803-3973-8
Type
conf
DOI
10.1109/REPCON.1997.595615
Filename
595615
Link To Document