• DocumentCode
    2335349
  • Title

    The vertical alignment of the DO overpass in the Fermilab Main Ring

  • Author

    Moore, C.D.

  • Author_Institution
    Fermi Nat. Accel. Lab., Batavia, IL, USA
  • fYear
    1989
  • fDate
    20-23 Mar 1989
  • Firstpage
    1957
  • Abstract
    The DO overpass was recently reconfigured in order to reduce the vertical dispersion in the Main Ring. The relationship between the global arrangement of the Main Ring quadrupoles and the placement of the quads in the overpass is described. There are various options that could have been adopted in dealing with the observed pattern: the pattern (and the closed orbit) could be kept the same while moving the quadrupoles several feet, the distribution could be smoothed, or the quads could be moved as though they had been on the global plane. The last option was chosen and an attempt to fix the closed orbit by moving quadrupoles outside the overpass was made. These corrections were applied using a modified version of DSCREWF; the surveyors were given elevation numbers which had already been corrected. The effect of these moves could be modeled using a conventional quadrupole move program
  • Keywords
    beam handling equipment; electron accelerators; storage rings; DO overpass; DSCREWF; Fermilab Main Ring; Main Ring quadrupoles; vertical alignment; Contracts; Earth; Educational institutions; Fasteners; Geometry; Laboratories; Magnets; Orbital calculations; Physics; Sea level;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1989. Accelerator Science and Technology., Proceedings of the 1989 IEEE
  • Conference_Location
    Chicago, IL
  • Type

    conf

  • DOI
    10.1109/PAC.1989.72982
  • Filename
    72982