DocumentCode
2336355
Title
Calculation of reserve requirement in reserve of talents model of personnel training system
Author
Yin, Zhe ; Guo, Yun Fei ; Gao, Di ; Lin, Feng ; Lai, Maosheng
Author_Institution
Math. Dept., Yanbian Univ., Yanji, China
fYear
2012
fDate
3-5 June 2012
Firstpage
184
Lastpage
187
Abstract
In this paper, based on the “personnel training “and “introduction of talents” model, for the N system where reserve of talents starts at the same time in different regions under the same storage conditions with probability P0 during the designed storage period [0, T0], the spare parts number M for N identical systems are derived. On the base of the same principle, a new method is proposed to reserve the spare parts at the same intervals. Examples are given to compare the two methods and illuminate the availability. This electronic document is a “live” template.
Keywords
personnel; probability; training; introduction of talents model; personnel training system; probability; reserve of talents model; reserve requirement; Availability; Humans; Mathematical model; Personnel; Random variables; Robots; Training; Availability; Personnel training; Reserve of talents model;
fLanguage
English
Publisher
ieee
Conference_Titel
Robotics and Applications (ISRA), 2012 IEEE Symposium on
Conference_Location
Kuala Lumpur
Print_ISBN
978-1-4673-2205-8
Type
conf
DOI
10.1109/ISRA.2012.6219154
Filename
6219154
Link To Document