DocumentCode
2340621
Title
Railway power SCADA system commissioning "case example"
Author
Hampton, Ian M. ; Lam, Kevin
Author_Institution
Pacific Trinity Int. Ltd., Hong Kong, China
fYear
2001
fDate
2001
Firstpage
185
Lastpage
193
Abstract
The Mass Transit Railway Corporation Ltd., installed and commissioned their first computer based Power Remote Control System in the late 1980s. The system was successfully replaced in February 2000. The paper describes the methodology adopted to prepare and facilitate the transition of the replacement computer based control system into operational service and a system review following one year of service operation
Keywords
SCADA systems; power system control; railways; rapid transit systems; software development management; telecontrol; Mass Transit Railway Corporation; case example; computer based power remote control system; operational service; railway power SCADA system commissioning; replacement computer based control system; service operation; system review; Communication system control; Computer aided software engineering; Contracts; Control systems; Partial response channels; Power system management; Programming; Rail transportation; SCADA systems; Weight control;
fLanguage
English
Publisher
ieee
Conference_Titel
Quality Software, 2001. Proceedings.Second Asia-Pacific Conference on
Conference_Location
Hong Kong
Print_ISBN
0-7695-1287-9
Type
conf
DOI
10.1109/APAQS.2001.990018
Filename
990018
Link To Document