Title :
Integrating Production Levels Using Blackboard Technology
Author :
Isenberg, Randolf
Author_Institution :
Deutsche Airbus GmbH
Keywords :
Computer integrated manufacturing; Control systems; Information management; Knowledge based systems; Logistics; Management information systems; Optimized production technology; Production facilities; Production planning; Throughput;
Conference_Titel :
Emerging Technologies and Factory Automation, 1992. IEEE International Workshop on
Print_ISBN :
0-7803-0886-7
DOI :
10.1109/ETFA.1992.683301