Title :
Status report on the GSI Synchrotron facility and first beam results
Author :
Blasche, K. ; Bohne, D.
Author_Institution :
GSI Darmstadt, West Germany
Abstract :
An account is given of the assembly phase of the SIS 18. The status of components and subsystems is reviewed. During an aperture test in November 1988 first beam results were obtained. A load test on the public grid with the SIS magnet power supply revealed that a mechanical power buffer has to be installed in the future
Keywords :
power supplies to apparatus; synchrotrons; GSI Synchrotron facility; SIS 18; aperture test; assembly phase; components; magnet power supply; mechanical power buffer; subsystems; Apertures; Assembly; Control systems; Design engineering; Linear particle accelerator; Magnetic separation; Power supplies; Structural beams; Synchrotrons; Testing;
Conference_Titel :
Particle Accelerator Conference, 1989. Accelerator Science and Technology., Proceedings of the 1989 IEEE
Conference_Location :
Chicago, IL
DOI :
10.1109/PAC.1989.73027