• DocumentCode
    2342615
  • Title

    Status report on the GSI Synchrotron facility and first beam results

  • Author

    Blasche, K. ; Bohne, D.

  • Author_Institution
    GSI Darmstadt, West Germany
  • fYear
    1989
  • fDate
    20-23 Mar 1989
  • Firstpage
    27
  • Abstract
    An account is given of the assembly phase of the SIS 18. The status of components and subsystems is reviewed. During an aperture test in November 1988 first beam results were obtained. A load test on the public grid with the SIS magnet power supply revealed that a mechanical power buffer has to be installed in the future
  • Keywords
    power supplies to apparatus; synchrotrons; GSI Synchrotron facility; SIS 18; aperture test; assembly phase; components; magnet power supply; mechanical power buffer; subsystems; Apertures; Assembly; Control systems; Design engineering; Linear particle accelerator; Magnetic separation; Power supplies; Structural beams; Synchrotrons; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1989. Accelerator Science and Technology., Proceedings of the 1989 IEEE
  • Conference_Location
    Chicago, IL
  • Type

    conf

  • DOI
    10.1109/PAC.1989.73027
  • Filename
    73027