DocumentCode
2345520
Title
Resource constrained modulo scheduling with global resource sharing
Author
Jäschke, Christoph ; Laur, Rainer
Author_Institution
Inst. for Electromagn. Theory & Microelectron., Bremen Univ., Germany
fYear
1998
fDate
2-4 Dec 1998
Firstpage
60
Lastpage
65
Abstract
Commonly used scheduling algorithms in high-level synthesis are not capable of sharing resources across process boundaries. This results in the usage of at least one resource per operation type and process. A new method is proposed in order to overcome these restrictions and to share high-cost or limited resources within a process group. This allows the use of less than one resource per operation type and process, while keeping the mutual independence of the involved processes. The method which represents an extension of general scheduling algorithms is not tied to a specific algorithm. The method is explained by using the common List Scheduling and further on applied to examples
Keywords
high level synthesis; resource allocation; scheduling; global resource sharing; high-level synthesis; list scheduling; modulo scheduling; process group; Clocks; Control system synthesis; Delay; Electronic switching systems; Merging; Microelectronics; Real time systems; Resource management; Scheduling algorithm; Timing;
fLanguage
English
Publisher
ieee
Conference_Titel
System Synthesis, 1998. Proceedings. 11th International Symposium on
Conference_Location
Hsinchu
ISSN
1080-1820
Print_ISBN
0-8186-8623-5
Type
conf
DOI
10.1109/ISSS.1998.730598
Filename
730598
Link To Document