DocumentCode
2346501
Title
Tevatron status
Author
Dugan, G.
Author_Institution
Fermilab, Batavia, IL, USA
fYear
1989
fDate
20-23 Mar 1989
Firstpage
426
Abstract
Since Tevatron commissioning in July 1983, the accelerator has operated in 1984, 1985, and 1987 with extracted beams of 800 GeV for three runs of fixed target physics, and in 1987 and 1988 with proton-antiproton colliding beams at 900×900 GeV. The collider operation of the Tevatron; its present status, and the outlook for its long-term future evolution are reviewed
Keywords
proton accelerators; synchrotrons; 1.8 TeV; 800 GeV; 900 GeV; Tevatron; accelerator; collider operation; fixed target physics; proton-antiproton colliding beams; Colliding beam accelerators; Cooling; Large-scale systems; Lattices; Optical filters; Particle beams; Proton accelerators; Stacking; Superconducting microwave devices; Synchrotrons;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1989. Accelerator Science and Technology., Proceedings of the 1989 IEEE
Conference_Location
Chicago, IL
Type
conf
DOI
10.1109/PAC.1989.73066
Filename
73066
Link To Document