• DocumentCode
    2346501
  • Title

    Tevatron status

  • Author

    Dugan, G.

  • Author_Institution
    Fermilab, Batavia, IL, USA
  • fYear
    1989
  • fDate
    20-23 Mar 1989
  • Firstpage
    426
  • Abstract
    Since Tevatron commissioning in July 1983, the accelerator has operated in 1984, 1985, and 1987 with extracted beams of 800 GeV for three runs of fixed target physics, and in 1987 and 1988 with proton-antiproton colliding beams at 900×900 GeV. The collider operation of the Tevatron; its present status, and the outlook for its long-term future evolution are reviewed
  • Keywords
    proton accelerators; synchrotrons; 1.8 TeV; 800 GeV; 900 GeV; Tevatron; accelerator; collider operation; fixed target physics; proton-antiproton colliding beams; Colliding beam accelerators; Cooling; Large-scale systems; Lattices; Optical filters; Particle beams; Proton accelerators; Stacking; Superconducting microwave devices; Synchrotrons;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1989. Accelerator Science and Technology., Proceedings of the 1989 IEEE
  • Conference_Location
    Chicago, IL
  • Type

    conf

  • DOI
    10.1109/PAC.1989.73066
  • Filename
    73066