DocumentCode
2348046
Title
TRIUMF KAON Factory pre-construction study
Author
Craddock, M.K. ; Astbury, A. ; Axen, D. ; Baartman, R. ; Barnes, M. ; Beveridge, J. ; Blackmore, E.W. ; Burge, R. ; Carey, J. ; Clark, G. ; Dawson, W.K. ; Dohan, D. ; Doornbos, J. ; Dutto, G. ; Enegren, T. ; Frammery, B. ; Haddock, C. ; Hodges, T.A. ; Kit
Author_Institution
TRIUMF, Vancouver, BC, Canada
fYear
1989
fDate
20-23 Mar 1989
Firstpage
450
Abstract
TRIUMF will carry out a 1-year preconstruction engineering design and impact study of the KAON Factory. This will enable prototypes to be built of various components of the TRIUMF Booster ring-a fast-cycling dipole magnet, dual-frequency magnet power supply, ceramic beam pipe, RF cavities (both parallel and perpendicular bias versions), and extraction kicker-and a rotating target for the 3-MW 30-GeV beam. Reviews are being carried out of racetrack designs for all five rings, of the shielding and remote handling requirements, and of the layout of the experimental areas. The design of the tunnels and buildings will be finalized, various impact studies carried out, and international involvement pursued further
Keywords
beam handling equipment; electromagnets; proton accelerators; shielding; storage rings; synchrotrons; 30 GeV; RF cavities; TRIUMF Booster ring; TRIUMF KAON Factory; ceramic beam pipe; dual-frequency magnet power supply; extraction kicker; fast-cycling dipole magnet; impact study; preconstruction engineering design; racetrack designs; remote handling requirements; shielding; Ceramics; Design engineering; Magnetic shielding; Mesons; Power engineering and energy; Power supplies; Production facilities; Prototypes; Radio frequency; Remote handling;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1989. Accelerator Science and Technology., Proceedings of the 1989 IEEE
Conference_Location
Chicago, IL
Type
conf
DOI
10.1109/PAC.1989.73076
Filename
73076
Link To Document