Operational experience of load shedding and new requirements on frequency relays
Author :
Lindahl, S. ; Runvik, G. ; Stranne, G.
Author_Institution :
ABB Network Partner AB, Sweden
fYear :
1997
fDate :
25-27 Mar 1997
Firstpage :
262
Lastpage :
265
Abstract :
This paper summarises experience and analysis of under-frequency load shedding and power generator islanding. Most power systems can withstand the loss of a single generating unit or a single transmission line. Simultaneous loss of several power system components may cause a severe deficit in active and reactive power. The action of overexcitation limiters on the remaining generators may further aggravate the situation. Such infrequent events may cause severe drop in system frequency and voltage magnitude. Frequency relays for load shedding and power generator islanding must operate correctly even if the system frequency decays and the voltage magnitude decays rapidly at the same time
Keywords :
power system control; active power; frequency decay; frequency relays; generating unit; operational experience; overexcitation limiters; power generator islanding; power systems; reactive power; transmission line; under-frequency load shedding; voltage magnitude decay;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Developments in Power System Protection, Sixth International Conference on (Conf. Publ. No. 434)
Conference_Location :
Nottingham
ISSN :
0537-9989
Print_ISBN :
0-85296-672-5
Type :
conf
DOI :
10.1049/cp:19970077
Filename :
608201
Link To Document :
بازگشت