• DocumentCode
    2353243
  • Title

    Highlights of Hercules Cement´s modernization

  • Author

    Smith, K.

  • fYear
    1995
  • fDate
    4-9 Jun 1995
  • Firstpage
    249
  • Lastpage
    272
  • Abstract
    In 1989, Hercules modified its cement plant direct coal firing system to a modern indirect system reducing the primary air percentage from 35% to 14% and improving the combustion efficiency. In 1990, Hercules built a new control room building and replaced its individual raw and finish mill analog control stations with centralized programmable logic controllers along with Industar software. Also during this time, the laboratory, which was housed in a separate building several hundred yards from the mills and kilns was relocated on the first level of the new control room building. The authors discuss the the scope of the project and describe its implementation. Project management aspects are also discussed
  • Keywords
    Decision making; Engineering management; Kilns; Knowledge engineering; Knowledge management; Maintenance engineering; Production planning; Project management; Technology management; Urban areas;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Cement Industry Technical Conference, 1995. XXXVII Conference Record., 1995 IEEE
  • Conference_Location
    San Juan
  • ISSN
    1079-9931
  • Print_ISBN
    0-7803-2456-0
  • Type

    conf

  • DOI
    10.1109/CITCON.1995.514337
  • Filename
    514337