DocumentCode :
2353243
Title :
Highlights of Hercules Cement´s modernization
Author :
Smith, K.
fYear :
1995
fDate :
4-9 Jun 1995
Firstpage :
249
Lastpage :
272
Abstract :
In 1989, Hercules modified its cement plant direct coal firing system to a modern indirect system reducing the primary air percentage from 35% to 14% and improving the combustion efficiency. In 1990, Hercules built a new control room building and replaced its individual raw and finish mill analog control stations with centralized programmable logic controllers along with Industar software. Also during this time, the laboratory, which was housed in a separate building several hundred yards from the mills and kilns was relocated on the first level of the new control room building. The authors discuss the the scope of the project and describe its implementation. Project management aspects are also discussed
Keywords :
Decision making; Engineering management; Kilns; Knowledge engineering; Knowledge management; Maintenance engineering; Production planning; Project management; Technology management; Urban areas;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Cement Industry Technical Conference, 1995. XXXVII Conference Record., 1995 IEEE
Conference_Location :
San Juan
ISSN :
1079-9931
Print_ISBN :
0-7803-2456-0
Type :
conf
DOI :
10.1109/CITCON.1995.514337
Filename :
514337
Link To Document :
بازگشت