DocumentCode :
2353266
Title :
Applications of CIM to the creation and sharing of the West-wide System Model
Author :
Chung, Lien ; Wangen, Brett ; Whitley, Eric
fYear :
2010
fDate :
25-29 July 2010
Firstpage :
1
Lastpage :
4
Abstract :
The Reliability Coordination Office (RCO) of the Western Electricity Coordinating Council (WECC) became operational in January 2009 in an on-going effort to monitor the reliable operations of the Western Interconnection in accordance with North American Electric Reliability Corporation (NERC) Reliability Standards. The West-wide System Model (WSM) is the nucleus of WECC´s Energy Management System (EMS), created from merging three network models represented in the Common Information Model (CIM) format. Thus far, the RCO tools using the WSM have proven to be robust with high solution availability. The WECC Reliability Coordinator function (RC) is now in the initial stages of defining a data-sharing framework that would best address its future goals and the needs of its members. This paper proposes a framework that relies on CIM as a format to exchange systems modeling information among independent applications. The advantages, limitations, and challenges of using a CIM-based framework are highlighted in regard to the WECC RC´s goal for model updating and data-sharing.
Keywords :
IEC standards; power system management; power system reliability; North American Electric Reliability Corporation; Western Electricity Coordinating Council; common information model; energy management system; reliability coordination office; west-wide system model; CIM; Energy Management System; IEC 61970; Power Systems Modeling; data exchange; data sharing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power and Energy Society General Meeting, 2010 IEEE
Conference_Location :
Minneapolis, MN
ISSN :
1944-9925
Print_ISBN :
978-1-4244-6549-1
Electronic_ISBN :
1944-9925
Type :
conf
DOI :
10.1109/PES.2010.5588156
Filename :
5588156
Link To Document :
بازگشت