• DocumentCode
    2358738
  • Title

    The effect of performance based incentive plans [IC manufacturing]

  • Author

    Ingersoll, Tim

  • Author_Institution
    Texas Instrum. Inc., Dallas, TX, USA
  • fYear
    1998
  • fDate
    23-25 Sep 1998
  • Firstpage
    115
  • Lastpage
    118
  • Abstract
    This report describes a method to simultaneously achieve and maintain production and quality goals through performance based incentive plans. Historically, at Texas Instruments´ DMOS IV wafer fab, the focus on one metric resulted in a loss of another. Achievement or failure to achieve fab goals had no noticeable impact on production specialists. Throughout this time, incentive plans were tried, but their metrics were complicated and not easily recognized by direct labor because they were outside of their immediate line of sight. By modifying, improving, and evolving our incentive program to meet business goals, DMOS IV experienced seven record output quarters over 2 years while improving in all other industry established metrics
  • Keywords
    MOS integrated circuits; integrated circuit measurement; integrated circuit reliability; integrated circuit yield; quality control; IC manufacturing; Texas Instruments DMOS IV wafer fab; business goals; incentive plan metrics; incentive plans; incentive program; industry established metrics; performance based incentive plans; production goals; quality goals; wafer fab metrics; Computer displays; Contracts; Employment; Financial management; Instruments; Logic; Manufacturing processes; Meeting planning; Metal products; Production;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Advanced Semiconductor Manufacturing Conference and Workshop, 1998. 1998 IEEE/SEMI
  • Conference_Location
    Boston, MA
  • ISSN
    1078-8743
  • Print_ISBN
    0-7803-4380-8
  • Type

    conf

  • DOI
    10.1109/ASMC.1998.731422
  • Filename
    731422