• DocumentCode
    2359627
  • Title

    Advanced human integrated assembly system

  • Author

    Voho, Paavo ; Kasui, J.J.J.

  • Author_Institution
    Tech. Res. Centre of Finland, Finland
  • fYear
    1994
  • fDate
    18-20 Jul 1994
  • Firstpage
    311
  • Lastpage
    316
  • Abstract
    The concept of flexible production has been around for several years now. But why are there so few really flexible production systems around? The problem is that flexibility has usually been seen either as a technical or as a human factors issue. It is neither, but both. This paper discusses some questions related to reducing the time, risk and complexity of flexible production line design and cutting product lead time to market by providing on-the-job information support on the shop floor
  • Keywords
    assembling; flexible manufacturing systems; human factors; production engineering computing; advanced human integrated assembly system; complexity; flexible production; flexible production line design; on-the-job information support; product lead time; risk; shop floor; Assembly systems; Control systems; Electrostatic precipitators; Humans; Industrial psychology; Laboratories; Lead time reduction; Manufacturing; Production systems; Time to market;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robot and Human Communication, 1994. RO-MAN '94 Nagoya, Proceedings., 3rd IEEE International Workshop on
  • Conference_Location
    Nagoya
  • Print_ISBN
    0-7803-2002-6
  • Type

    conf

  • DOI
    10.1109/ROMAN.1994.365911
  • Filename
    365911