• DocumentCode
    2362837
  • Title

    Better dispatch application-a success story [IC manufacture]

  • Author

    Giegandt, Anke ; Nicholson, Gary

  • Author_Institution
    Siemens AG, Munich, Germany
  • fYear
    1998
  • fDate
    23-25 Sep 1998
  • Firstpage
    396
  • Lastpage
    399
  • Abstract
    Using priority rules, a project was conducted to implement a dispatching system in a high-volume semiconductor front-end production line. The specific goals of this project were to apply dispatch rules to reduce cycle time and balance the WIP in the line. This paper presents the project methodology, implemented dispatch policies and measurable results in different production areas, including furnace/wet etch, CMP, plasma etch, ion implantation, and lithography
  • Keywords
    chemical mechanical polishing; dispatching; integrated circuit manufacture; ion implantation; lithography; manufacturing resources planning; production control; scheduling; sputter etching; CMP; IC manufacture; WIP balancing; cycle time; dispatch application; dispatch rules; dispatching system; furnace; implemented dispatch policies; ion implantation; lithography; plasma etch; priority rules; production areas; project methodology; volume semiconductor front-end production line; wet etch; Application specific integrated circuits; Area measurement; Dispatching; Furnaces; Manufacturing; Plasma applications; Plasma measurements; Production systems; Semiconductor device manufacture; Wet etching;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Advanced Semiconductor Manufacturing Conference and Workshop, 1998. 1998 IEEE/SEMI
  • Conference_Location
    Boston, MA
  • ISSN
    1078-8743
  • Print_ISBN
    0-7803-4380-8
  • Type

    conf

  • DOI
    10.1109/ASMC.1998.731632
  • Filename
    731632