DocumentCode
2362837
Title
Better dispatch application-a success story [IC manufacture]
Author
Giegandt, Anke ; Nicholson, Gary
Author_Institution
Siemens AG, Munich, Germany
fYear
1998
fDate
23-25 Sep 1998
Firstpage
396
Lastpage
399
Abstract
Using priority rules, a project was conducted to implement a dispatching system in a high-volume semiconductor front-end production line. The specific goals of this project were to apply dispatch rules to reduce cycle time and balance the WIP in the line. This paper presents the project methodology, implemented dispatch policies and measurable results in different production areas, including furnace/wet etch, CMP, plasma etch, ion implantation, and lithography
Keywords
chemical mechanical polishing; dispatching; integrated circuit manufacture; ion implantation; lithography; manufacturing resources planning; production control; scheduling; sputter etching; CMP; IC manufacture; WIP balancing; cycle time; dispatch application; dispatch rules; dispatching system; furnace; implemented dispatch policies; ion implantation; lithography; plasma etch; priority rules; production areas; project methodology; volume semiconductor front-end production line; wet etch; Application specific integrated circuits; Area measurement; Dispatching; Furnaces; Manufacturing; Plasma applications; Plasma measurements; Production systems; Semiconductor device manufacture; Wet etching;
fLanguage
English
Publisher
ieee
Conference_Titel
Advanced Semiconductor Manufacturing Conference and Workshop, 1998. 1998 IEEE/SEMI
Conference_Location
Boston, MA
ISSN
1078-8743
Print_ISBN
0-7803-4380-8
Type
conf
DOI
10.1109/ASMC.1998.731632
Filename
731632
Link To Document