• DocumentCode
    236389
  • Title

    Utilization of the integration readiness level in operative systems

  • Author

    Mantere, Eeva ; Pirinen, Rauno

  • Author_Institution
    Bus. & Inf. Syst., Leppavaara, Laurea Univ. of Appl. Sci., Espoo, Finland
  • fYear
    2014
  • fDate
    3-6 Dec. 2014
  • Firstpage
    726
  • Lastpage
    735
  • Abstract
    In this case study, the research question is: How can the Integration Readiness Level metrics be understood and realized in integration projects. The performed analysis was qualitative and included: interviews of experts in the case company (n=5 in which n=3 valid) representing experience in system integrations (n=121); literature reviewed for evidence (n=16); and documents (n=26) as research data.
  • Keywords
    business data processing; information systems; integration readiness level metrics; operative systems; system integrations; Companies; Data collection; ISO standards; Interviews; Measurement; business and information systems; integration readiness level; maturity; prescriptive metrics;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Interactive Collaborative Learning (ICL), 2014 International Conference on
  • Conference_Location
    Dubai
  • Type

    conf

  • DOI
    10.1109/ICL.2014.7017860
  • Filename
    7017860