• DocumentCode
    2364008
  • Title

    Application of fuzzy set theory to project scheduling of bridge construction

  • Author

    Natsuaki, Y. ; Furuta, H. ; Takase, K. ; Iemura, T. ; Muto, K. ; Ninomiya, H.

  • Author_Institution
    Katayama Stratech Corp., Osaka, Japan
  • fYear
    1993
  • fDate
    25-28 Apr 1993
  • Firstpage
    514
  • Lastpage
    519
  • Abstract
    The present research treats various kinds of uncertainties which influence the activity duration for each separate erection process in terms of fuzzy sets. Then, the necessary number of days for the completion of the erection can be obtained as fuzzy quantities by using fuzzy reasoning. On the basis of the fuzzy performance evaluation and review technique (PERT) network thus obtained, linear programming is used to calculate the overall project duration and its certainty. As a simple numerical example, the erection of a simple girder bridge is considered
  • Keywords
    PERT; civil engineering computing; construction industry; fuzzy set theory; fuzzy systems; linear programming; activity duration; bridge construction; erection process; fuzzy performance evaluation; fuzzy quantities; fuzzy reasoning; fuzzy set theory; girder bridge; linear programming; project scheduling; Bridges; Cranes; Fuzzy reasoning; Fuzzy set theory; Iron; Least squares approximation; Linear programming; Standards activities; Steel; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Uncertainty Modeling and Analysis, 1993. Proceedings., Second International Symposium on
  • Conference_Location
    College Park, MD
  • Print_ISBN
    0-8186-3850-8
  • Type

    conf

  • DOI
    10.1109/ISUMA.1993.366721
  • Filename
    366721