Title :
Long-term/mid-term resource optimization of a hydro-dominant power system using interior point method
Author :
Christoforidis, M. ; Aganagic, M. ; Awobamise, B. ; Tong, S. ; Rahimi, A.F.
Author_Institution :
Schweizerische Bundesbahnen, Zollikofen, Switzerland
Abstract :
This paper describes the modeling approach and the solution techniques that were employed in developing the long-term/mid-term resource scheduling (LMRS) function for the power system of Schweizerische Bundesbahnen (Swiss Railways). LMRS together with the annual load forecast and annual maintenance scheduling functions constitute the long-term/mid-term operational planning subsystem of Swiss Railways´ new energy management system
Keywords :
hydroelectric power stations; load forecasting; load management; maintenance engineering; optimisation; power system planning; railways; Swiss Railways; energy management system; hydro-dominant power system; interior point method; load forecast; long-term/mid-term resource scheduling; maintenance scheduling; operational planning; resource optimization; Contracts; Land mobile radio; Power system control; Power system modeling; Power system planning; Power systems; Process planning; Rail transportation; Reservoirs; Scheduling;
Conference_Titel :
Power Industry Computer Application Conference, 1995. Conference Proceedings., 1995 IEEE
Conference_Location :
Salt Lake City, UT
Print_ISBN :
0-7803-2663-6
DOI :
10.1109/PICA.1995.515180