DocumentCode
2371425
Title
Optimal resource allocation for the quality control process
Author
Jalote, Pankaj ; Vishal, Bijendra
Author_Institution
Dept. of Comput. Sc. & Engg., Indian Inst. of Technol., Kanpur, India
fYear
2003
fDate
17-20 Nov. 2003
Firstpage
26
Lastpage
33
Abstract
Software development project employs some quality control (QC) process to detect and remove defects. The final quality of the delivered software depends on the effort spent on all the QC stages. Given a quality goal, different combinations of efforts for the different QC stages may lead to the same goal. In this paper, we address the problem of allocating resources to the different QC stages, such that the optimal quality is obtained. We propose a model for the cost of QC process and then view the resource allocation among different QC stages as an optimization problem. We solve this optimization problem using non-linear optimization technique of sequential quadratic programming. We also give examples to show how a sub-optimal resource allocation may either increase the resource requirement significantly or lower the quality of the final software.
Keywords
quadratic programming; quality control; resource allocation; software quality; software reliability; nonlinear optimization; optimal quality; optimal resource allocation; optimization problem; quality control; resource requirement; sequential quadratic programming; software development project; software quality; suboptimal resource allocation; Cost function; Delay; Quadratic programming; Quality control; Resource management; Software performance; Software quality; Software reliability; Software testing; System testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Software Reliability Engineering, 2003. ISSRE 2003. 14th International Symposium on
ISSN
1071-9458
Print_ISBN
0-7695-2007-3
Type
conf
DOI
10.1109/ISSRE.2003.1251028
Filename
1251028
Link To Document