• DocumentCode
    2372523
  • Title

    Effective capital project commissioning

  • Author

    Tribe, Michael G. ; Johnson, Rory R.

  • Author_Institution
    Weyerhaeuser Co., Portland, OR
  • fYear
    2008
  • fDate
    22-27 June 2008
  • Firstpage
    106
  • Lastpage
    119
  • Abstract
    Commissioning is an important stage of any large or small capital project. This paper discusses several important aspects of organizing and executing an effective capital project commissioning effort. The authors discuss key concepts that have produced superior project results. Topics such as roles and responsibilities, safety planning, resource planning, communication and staging are discussed.
  • Keywords
    commissioning; electrical safety; capital project commissioning; resource planning; safety planning; Costs; Design engineering; Engineering drawings; Investments; Job shop scheduling; Milling machines; Organizing; Production; Safety; Solids; Commissioning Safety; Communication; Lockout; Roles and Responsibilities; Scheduling; Shared Responsibility;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Pulp and Paper Industry Technical Conference, 2008. PPIC 2008. Conference Record of 2008 54th Annual
  • Conference_Location
    Seattle, WA
  • ISSN
    0190-2172
  • Print_ISBN
    978-1-4244-2524-2
  • Electronic_ISBN
    0190-2172
  • Type

    conf

  • DOI
    10.1109/PAPCON.2008.4585812
  • Filename
    4585812