DocumentCode
2372523
Title
Effective capital project commissioning
Author
Tribe, Michael G. ; Johnson, Rory R.
Author_Institution
Weyerhaeuser Co., Portland, OR
fYear
2008
fDate
22-27 June 2008
Firstpage
106
Lastpage
119
Abstract
Commissioning is an important stage of any large or small capital project. This paper discusses several important aspects of organizing and executing an effective capital project commissioning effort. The authors discuss key concepts that have produced superior project results. Topics such as roles and responsibilities, safety planning, resource planning, communication and staging are discussed.
Keywords
commissioning; electrical safety; capital project commissioning; resource planning; safety planning; Costs; Design engineering; Engineering drawings; Investments; Job shop scheduling; Milling machines; Organizing; Production; Safety; Solids; Commissioning Safety; Communication; Lockout; Roles and Responsibilities; Scheduling; Shared Responsibility;
fLanguage
English
Publisher
ieee
Conference_Titel
Pulp and Paper Industry Technical Conference, 2008. PPIC 2008. Conference Record of 2008 54th Annual
Conference_Location
Seattle, WA
ISSN
0190-2172
Print_ISBN
978-1-4244-2524-2
Electronic_ISBN
0190-2172
Type
conf
DOI
10.1109/PAPCON.2008.4585812
Filename
4585812
Link To Document