Title :
Optimization of load shedding scheme in an integrated process plant
Author :
Grewal, Gursharan S. ; Konowalec, John W. ; Hakim, Mak
Author_Institution :
Syncrude Canada Ltd., Fort McMurray, Alta., Canada
Abstract :
An integrated process facility recently went through an update of its existing load shedding scheme due to planned process changes in the coming years. Transient simulations indicated that by changing the load shedding philosophy, the frequency profile during power shortages can be improved significantly. This paper discusses the industrial plant´s electrical/steam load balance issues, and the development of a high speed load shedding scheme
Keywords :
cogeneration; control system analysis computing; industrial power systems; load shedding; optimal control; power station load; power system analysis computing; power system control; steam power stations; CHP; computer simulation; control simulation; frequency profile; integrated process plant; load shedding optimisation; power shortages; transient simulation; Distributed power generation; Frequency; Performance analysis; Petroleum; Power engineering and energy; Power generation; Stability; Transient response; Turbines; Voltage;
Conference_Titel :
Industrial and Commercial Power Systems Technical Conference, 1997. Conference Record, Papers Presented at the 1997 Annual Meeting., IEEE 1997
Conference_Location :
Philadelphia, PA
Print_ISBN :
0-7803-3825-1
DOI :
10.1109/ICPS.1997.595999