• DocumentCode
    2378066
  • Title

    Loma Linda Medical Accelerator Project

  • Author

    Cole, F.T. ; Livdahl, P.V. ; Mills, F.E. ; Teng, L.C.

  • Author_Institution
    Fermi Nat. Accel. Lab., Batavia, IL, USA
  • fYear
    1989
  • fDate
    20-23 Mar 1989
  • Firstpage
    737
  • Abstract
    The status of the Loma Linda Medical Accelerator Project is reviewed. In late December 1988, the first 2.0-MeV beam was injected into and accelerated in the synchrotron. By January 10, 1989, protons had been accelerated to the design maximum energy of 250 MeV. This operation was accomplished in a temporary shielding enclosure within a Fermilab shop building using an entire complement of borrowed power supplies adapted for this purpose. The medical applications of this facility are described
  • Keywords
    proton accelerators; radiation therapy; reviews; synchrotrons; Fermilab shop building; Loma Linda Medical Accelerator Project; power supplies; protons; synchrotron; temporary shielding enclosure; Acceleration; Cancer; Cobalt; Laboratories; Medical treatment; Neoplasms; Particle beams; Proton accelerators; Structural beams; X-rays;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1989. Accelerator Science and Technology., Proceedings of the 1989 IEEE
  • Conference_Location
    Chicago, IL
  • Type

    conf

  • DOI
    10.1109/PAC.1989.73237
  • Filename
    73237