• DocumentCode
    2381830
  • Title

    Outsourcing T&D Infrastructure Projects - Burbank Water & Power

  • Author

    Birla, Dev D. ; McCorkle, Robert M.

  • Author_Institution
    Department of Water & Power, Burbank, CA
  • fYear
    2006
  • fDate
    21-24 May 2006
  • Firstpage
    206
  • Lastpage
    208
  • Abstract
    In the mid 1990´s, the City of Burbank´s Water and Power Department (BWP) needed to focus on the electric infrastructure needs of their world-class media customers. Although the first two self-performed substation projects met BWP objectives, the process had major project management and coordination shortcomings. For its more recent station projects, BWP uses Design-Build outsourcing that provides single point accountability. This approach maintains a critical focus on cost control and schedule adherence, while addressing labor concerns and maintaining end user satisfaction
  • Keywords
    customer satisfaction; outsourcing; power system management; power system planning; project management; Burbank Water & Power Department; Design-Build outsourcing; electric infrastructure; project management; Cities and towns; Costs; Geographic Information Systems; Maintenance; Outsourcing; Procurement; Project management; Scheduling; Substations; Switchgear;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Transmission and Distribution Conference and Exhibition, 2005/2006 IEEE PES
  • Conference_Location
    Dallas, TX
  • Print_ISBN
    0-7803-9194-2
  • Type

    conf

  • DOI
    10.1109/TDC.2006.1668484
  • Filename
    1668484