• DocumentCode
    2385813
  • Title

    Grid integration issues for large scale wind power plants (WPPs)

  • Author

    Wu, Qiuwei ; Xu, Zhao ; Østergaard, Jacob

  • Author_Institution
    Center for Electr. Technol., Tech. Univ. of Denmark, Lyngby, Denmark
  • fYear
    2010
  • fDate
    25-29 July 2010
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    The penetration level of wind power into the power system over the world have been increasing very fast in the last few years and is still keeping the fast growth rate. It is just a matter of time that the wind power will be comparable to the conventional power generation. Therefore, many transmission system operators (TSOs) over the world have come up the grid codes to request the wind power plants (WPPs) to have more or less the same operating capability as the conventional power plants. The grid codes requirements from other TSOs are under development. This paper covers the steady state operation and low voltage ride through (LVRT) for the WPPs. The discussion of coping with the grid codes requirements is presented to come up with the grid codes complied WPPs solutions.
  • Keywords
    power grids; power transmission; wind power; wind power plants; conventional power generation; grid code; grid integration issue; large scale wind power plant; low voltage ride through; power system; transmission system operator; Frequency Control; Grid Codes; Grid Integration Issues; Low Voltage Ride Through; PQ Capability; Transmission System Operators (TSOs); Voltage Control; Wind Power; Wind Power Plants (WPPs);
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Society General Meeting, 2010 IEEE
  • Conference_Location
    Minneapolis, MN
  • ISSN
    1944-9925
  • Print_ISBN
    978-1-4244-6549-1
  • Electronic_ISBN
    1944-9925
  • Type

    conf

  • DOI
    10.1109/PES.2010.5589952
  • Filename
    5589952