Many Korean companies are eager to construct wind farms in Jeju Island, thanks to the Government´s policy of supporting renewable energy. Total capacity of planned wind farm is 250MW and government´s target is 500MW. At the same time local government of Jeju Island has plans to build new 300MW LNG power plant or 400MW HVDC#2 with mainland. However local power demand of Jeju Island will not be increased largely in near future. Therefore the utilization factors of conventional units are to be decreased significantly. Over construction compare with scale of Jeju power system is worried in this case, it is needed to verify the feasibility of both plans. In this research, the impact on utilization factor of conventional units and HVDC transmission with increased wind power penetration level is presented. And impact of devices planned - LNG, HVDC- is also investigated. The best way for Jeju Island case to increase wind power is presented in this paper.
Keywords :
HVDC power transmission; natural gas technology; wind power plants; HVDC transmission; Jeju Island; LNG power plant; power 250 MW; power 300 MW; power 400 MW; power 500 MW; renewable energy; utilization factor; wind farms; wind power penetration level; HVDC; Instantaneous wind power penetration limit; Utilization factor; Wind power; Wind power rejection;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power and Energy Society General Meeting, 2010 IEEE
Conference_Location :
Minneapolis, MN
ISSN :
1944-9925
Print_ISBN :
978-1-4244-6549-1
Electronic_ISBN :
1944-9925
Type :
conf
DOI :
10.1109/PES.2010.5590000
Filename :
5590000
Link To Document :
بازگشت