• DocumentCode
    2387041
  • Title

    Current mechanisms for procurement and payment of power reserve services

  • Author

    Carlton, Jon

  • fYear
    1998
  • fDate
    35831
  • Firstpage
    42522
  • Lastpage
    42526
  • Abstract
    The UK National Grid Company (NGC) operates under a statutory obligation to maintain the power system frequency within ±1% from nominal, i.e. between 49.5 to 50.5 Hz. The balance between demand and generation must therefore be continuously and automatically maintained such that this obligation is met. This paper describes the commercial arrangements and mechanisms for the procurement and payment of frequency response services in England and Wales
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    IEE Colloquium on Economic Provision Of A Frequency Responsive Power Reserve Service (98/190)
  • Conference_Location
    London
  • Type

    conf

  • DOI
    10.1049/ic:19980018
  • Filename
    667653