DocumentCode :
2387324
Title :
Using load resources to meet ancillary service requirements in the ERCOT market: A case study
Author :
Mickey, Joel
Author_Institution :
ERCOT, Austin, TX, USA
fYear :
2010
fDate :
25-29 July 2010
Firstpage :
1
Lastpage :
2
Abstract :
The presentation will show a history of past deployments over the past 4 years. For selected events, we will discuss curtailment duration and the reason that triggered these deployments. A specific event that we will discuss occurred in February 2008 when ERCOT experienced a dramatic increase in load combined with a large drop in wind generation, which led to a system-wide deployment of Load Resources providing Responsive Reserves. We plan to conclude the presentation by discussing some of the new challenges and opportunities that Load Resources are facing as ERCOT moves from a Zonal Market Structure to a Nodal Market Structure.
Keywords :
power markets; power station load; wind power plants; ERCOT market; ancillary service requirements; case study; load resources; wind generation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power and Energy Society General Meeting, 2010 IEEE
Conference_Location :
Minneapolis, MN
ISSN :
1944-9925
Print_ISBN :
978-1-4244-6549-1
Electronic_ISBN :
1944-9925
Type :
conf
DOI :
10.1109/PES.2010.5590030
Filename :
5590030
Link To Document :
بازگشت