Achieving stretched capacity goal through integrated engineering and manufacturing excellence
Author :
Kwooi, Reginald See Theam
Author_Institution :
Intel Technol., Penang, Malaysia
fYear :
2000
fDate :
2000
Firstpage :
391
Lastpage :
394
Abstract :
Achieving stretched equipment capacity and high productivity in high volume manufacturing is a gritty challenge to drive down cost continuously in this competitive chipset market. With unprecedented volume ramp of both key products in Q4´99, the Test Module faced a shortage of two to four testers. Driving through working group, a refurbishment process was achieved successfully resulting in 60% reduction of tester faults thus improving mean time between failure (MTBF) from 140 hrs to 160 hrs. With the implementation of improved pogo pins at Tester Interface Unit (TIU) and test head had improved cleaning frequency from 5 k to 90 k, one-sum test yield from 88.7% to 97.5% and reduced non-genuine SBL from 10% to less than 3% consistently
Keywords :
integrated circuit manufacture; integrated circuit testing; 140 to 160 hour; Test Module; Tester Interface Unit; competitive chipset market; high productivity; high volume manufacturing; improved cleaning frequency; integrated engineering-manufacturing excellence; mean time between failure; one-sum test yield; refurbishment process; stretched capacity goal; tester faults reduction; volume ramp; Capacitors; Cleaning; Costs; Frequency; Hardware; Magnetic heads; Manufacturing; Power supplies; Productivity; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Semiconductor Manufacturing, 2000. Proceedings of ISSM 2000. The Ninth International Symposium on
Conference_Location :
Tokyo
ISSN :
1523-553X
Print_ISBN :
0-7803-7392-8
Type :
conf
DOI :
10.1109/ISSM.2000.993695
Filename :
993695
Link To Document :
بازگشت