An advanced simulator applied to control centre testing and operator training
Author
Adams, R.C.
Author_Institution
Westinghouse Signals Ltd., Chippenham, UK
fYear
1998
fDate
20-23 Apr 1998
Firstpage
155
Lastpage
160
Abstract
London Underground´s Central Line has 49 stations and extends for approximately 55 kilometres. The line has been completely resignalled throughout, with the associated introduction of new trains and automatic train operation (ATO). Very few changes have been made to the geography of the line as the new signalling has been introduced. Five depots and two sets of fan sidings for overnight stabling result in both the line geography and the timetabled service patterns being complex. A new signalling control system (SCS) has also been provided and this is in the final stages of commissioning. Prior to the provision of the new systems, there was no centralised control, and so one of the key deliverables under the scope of the SCS contract is a real-time simulator. Whilst the simulator has the primary role of operator training, it has also evolved to be an essential tool for the setting to work of the control system and the testing of its control philosophy, before the system is applied in passenger service
Keywords
railways; 55 km; automatic train operation; centralised control; computer simulation; control simulation; electric railways; operator training; passenger service; rail traffic control; real-time simulator; signalling control system;
fLanguage
English
Publisher
iet
Conference_Titel
Developments in Mass Transit Systems, 1998. International Conference on (Conf. Publ. No. 453)
Conference_Location
London
ISSN
0537-9989
Print_ISBN
0-85296-703-9
Type
conf
DOI
10.1049/cp:19980112
Filename
683587
Link To Document