DocumentCode
2388885
Title
Innovative planning approaches for generator interconnection group study
Author
Zhu, Y. ; Brown, D. ; Jehring, P. ; Tewari, D. ; Mishra, Y.
Author_Institution
Siemens PTI, Minnetonka, MN, USA
fYear
2010
fDate
25-29 July 2010
Firstpage
1
Lastpage
6
Abstract
Today, a large number of wind generator interconnection requests have been queued and are being processed. The generator interconnection group study is a way to reduce the generator interconnection cycle time and increase interconnection certainty. However, it is very challenging to identify the “best” transmission upgrades for a large group of generator interconnections. It is also very important to differentiate the constraints caused by each generator interconnection request and identify their responsibilities for transmission upgrades. This paper outlines some innovative study approaches that can be used in a group study with large numbers of generator interconnection requests in a constrained area. Improved study methods are introduced, and a summary and conclusions are derived from the study.
Keywords
AC generators; power generation planning; power system interconnection; power transmission planning; wind power plants; AC contingency analysis; generator interconnection group study; innovative planning approach; transmission planning; wind generator interconnection; AC Contingency Analysis; Divide and Conquer; Generator Interconnection Group Study; Generator Sensitivity; Greedy Algorithm; Stability Analysis; Transmission Planning; Wind Generation;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Society General Meeting, 2010 IEEE
Conference_Location
Minneapolis, MN
ISSN
1944-9925
Print_ISBN
978-1-4244-6549-1
Electronic_ISBN
1944-9925
Type
conf
DOI
10.1109/PES.2010.5590111
Filename
5590111
Link To Document