• DocumentCode
    2388885
  • Title

    Innovative planning approaches for generator interconnection group study

  • Author

    Zhu, Y. ; Brown, D. ; Jehring, P. ; Tewari, D. ; Mishra, Y.

  • Author_Institution
    Siemens PTI, Minnetonka, MN, USA
  • fYear
    2010
  • fDate
    25-29 July 2010
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    Today, a large number of wind generator interconnection requests have been queued and are being processed. The generator interconnection group study is a way to reduce the generator interconnection cycle time and increase interconnection certainty. However, it is very challenging to identify the “best” transmission upgrades for a large group of generator interconnections. It is also very important to differentiate the constraints caused by each generator interconnection request and identify their responsibilities for transmission upgrades. This paper outlines some innovative study approaches that can be used in a group study with large numbers of generator interconnection requests in a constrained area. Improved study methods are introduced, and a summary and conclusions are derived from the study.
  • Keywords
    AC generators; power generation planning; power system interconnection; power transmission planning; wind power plants; AC contingency analysis; generator interconnection group study; innovative planning approach; transmission planning; wind generator interconnection; AC Contingency Analysis; Divide and Conquer; Generator Interconnection Group Study; Generator Sensitivity; Greedy Algorithm; Stability Analysis; Transmission Planning; Wind Generation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Society General Meeting, 2010 IEEE
  • Conference_Location
    Minneapolis, MN
  • ISSN
    1944-9925
  • Print_ISBN
    978-1-4244-6549-1
  • Electronic_ISBN
    1944-9925
  • Type

    conf

  • DOI
    10.1109/PES.2010.5590111
  • Filename
    5590111