Innovative planning approaches for generator interconnection group study
Author :
Zhu, Y. ; Brown, D. ; Jehring, P. ; Tewari, D. ; Mishra, Y.
Author_Institution :
Siemens PTI, Minnetonka, MN, USA
fYear :
2010
fDate :
25-29 July 2010
Firstpage :
1
Lastpage :
6
Abstract :
Today, a large number of wind generator interconnection requests have been queued and are being processed. The generator interconnection group study is a way to reduce the generator interconnection cycle time and increase interconnection certainty. However, it is very challenging to identify the “best” transmission upgrades for a large group of generator interconnections. It is also very important to differentiate the constraints caused by each generator interconnection request and identify their responsibilities for transmission upgrades. This paper outlines some innovative study approaches that can be used in a group study with large numbers of generator interconnection requests in a constrained area. Improved study methods are introduced, and a summary and conclusions are derived from the study.
Keywords :
AC generators; power generation planning; power system interconnection; power transmission planning; wind power plants; AC contingency analysis; generator interconnection group study; innovative planning approach; transmission planning; wind generator interconnection; AC Contingency Analysis; Divide and Conquer; Generator Interconnection Group Study; Generator Sensitivity; Greedy Algorithm; Stability Analysis; Transmission Planning; Wind Generation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power and Energy Society General Meeting, 2010 IEEE
Conference_Location :
Minneapolis, MN
ISSN :
1944-9925
Print_ISBN :
978-1-4244-6549-1
Electronic_ISBN :
1944-9925
Type :
conf
DOI :
10.1109/PES.2010.5590111
Filename :
5590111
Link To Document :
بازگشت