DocumentCode
2389338
Title
Proof-of-concept testing for IEC 61850 DESN substations
Author
Tan, Jian-Cheng ; Ciufo, John ; Kueng, Francis ; Martin, David
Author_Institution
Kinectrics Inc., Toronto, ON, Canada
fYear
2010
fDate
25-29 July 2010
Firstpage
1
Lastpage
6
Abstract
The proof-of-concept interoperability testing for the IEC 61850 design of Hydro One Dual Element Spot Network (DESN) substation is presented in this paper. The necessity to conduct proof-of-concept interoperability testing is addressed and discussed. An example is given to demonstrate how proof-of-concept interoperability testing is applied to the DESN substation automation system prior to full scope integration and field deployment, the lessons learnt and the experience gained in deploying the IEC 61850 based substation automation systems.
Keywords
IEC standards; hydroelectric power stations; open systems; substation automation; DESN substation automation; IEC 61850 DESN substations; hydro one dual element spot network; proof-of-concept interoperability testing; GOOSE; conformance test; interoperability; interoperability testing; proof-of-concept interoperability testing; substation automation system;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Society General Meeting, 2010 IEEE
Conference_Location
Minneapolis, MN
ISSN
1944-9925
Print_ISBN
978-1-4244-6549-1
Electronic_ISBN
1944-9925
Type
conf
DOI
10.1109/PES.2010.5590133
Filename
5590133
Link To Document