DocumentCode
2395359
Title
4 Years history: From 2D to BIM for CH: The main spire on Milan Cathedral
Author
Achille, Cristiana ; Fassi, Francesco ; Fregonese, Luigi
Author_Institution
BEST - Building Environ. Sci. & Technol., Politec. di Milano, Milan, Italy
fYear
2012
fDate
2-5 Sept. 2012
Firstpage
377
Lastpage
382
Abstract
The paper presented describes the final step of four years survey activities on Milan Cathedral. The main aim of the job was to survey and model the big spire to support restoration works that had just started. The last stage was to transform the great model into a 3D WEB BIM to help manage and organize restoration works.
Keywords
Internet; architecture; geographic information systems; history; solid modelling; 3D WEB BIM; Milan Cathedral; big spire modeling; big spire survey; cultural heritage; restoration work management; restoration work organization; Cultural differences; Data models; Image restoration; Laser modes; Measurement by laser beam; Software; Solid modeling; Cultural Heritage; Data collection; Image Modelling; Laser scanner; Real Based 3D Modelling; Web-GIS 3D;
fLanguage
English
Publisher
ieee
Conference_Titel
Virtual Systems and Multimedia (VSMM), 2012 18th International Conference on
Conference_Location
Milan
Print_ISBN
978-1-4673-2564-6
Electronic_ISBN
978-1-4673-2563-9
Type
conf
DOI
10.1109/VSMM.2012.6365948
Filename
6365948
Link To Document