DocumentCode :
2396020
Title :
Building IT infrastructure to bid generation in ERCOT
Author :
Miller, Gary ; Gurley, Larry
Author_Institution :
Texas Univ., Dallas, TX, USA
Volume :
3
fYear :
2002
fDate :
25-25 July 2002
Abstract :
Summary form only given, as follows. In the past, a generating utility had time to study the generation scheduling and pricing problem at a comparative leisurely pace. To meet the daily bidding deadline in ERCOT, TXU (USA) built a sophisticated IT infrastructure to automatically gather data (load forecasts, fuel costs, heat rates, etc.) for generation scheduling, bidding, and settlement. This paper describes the IT infrastructure that they built to bid generation in ERCOT and share their deployment experience.
Keywords :
power engineering computing; power generation economics; power generation planning; power generation scheduling; tariffs; ERCOT; IT infrastructure; TXU; USA; automatic data gathering; daily bidding deadline; generation pricing; generation scheduling; Costs; Fuels; Load forecasting; Pricing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering Society Summer Meeting, 2002 IEEE
Conference_Location :
Chicago, IL, USA
Print_ISBN :
0-7803-7518-1
Type :
conf
DOI :
10.1109/PESS.2002.1043572
Filename :
1043572
Link To Document :
بازگشت