• DocumentCode
    2398440
  • Title

    Research on the Application of the Virtual United Organization in the Prophase of the Construction Project

  • Author

    Hong Ke ; Zhenhua Song ; Juan Li

  • Author_Institution
    Sch. of Manage., Tianjin Univ. of Technol., Tianjin, China
  • fYear
    2010
  • fDate
    7-9 May 2010
  • Firstpage
    2776
  • Lastpage
    2778
  • Abstract
    Currently, the keystone of cost control has been moving from the Construction Phase to the prophase of construction project. However as there are still a lot of uncertain factors and the information obtained in the prophase is limited, there are yet no good methods for cost control in the prophase of the construction project. Virtual Organization, as one control method, has been applied in the cost control practice and it has made an impact on cost control. However, Virtual Organization is still not able to fully solve the problems in the prophase of the construction project. Based on the present researches, this paper tries to further improve the cost control level in the prophase of the construction project through establishing the Virtual United Organization and analyzing its applications. In the Virtual United Organization, the Work Package is creatively used to check each scheme and control the project cost.
  • Keywords
    construction industry; organisational aspects; virtual enterprises; construction project; cost control; virtual united organization; Construction industry; Decision making; Internet; Lead; Organizations; Project management; Standards organizations; Construction project; Cost control; Virtual United Organization;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    E-Business and E-Government (ICEE), 2010 International Conference on
  • Conference_Location
    Guangzhou
  • Print_ISBN
    978-0-7695-3997-3
  • Type

    conf

  • DOI
    10.1109/ICEE.2010.701
  • Filename
    5590746