• DocumentCode
    239987
  • Title

    Prioritization of underground transmission cable renewal projects in power electric utility companies

  • Author

    Wong, Kai-Kit

  • Author_Institution
    Transm. Eng. Hydro One Networks Inc., Toronto, ON, Canada
  • fYear
    2014
  • fDate
    4-7 May 2014
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    This paper reviews the current asset management methodologies in power electric utility companies and identifies the present challenges and problems encountered by utility companies with the current methodologies in managing and prioritizing underground transmission cable asset renewal projects. This paper proposes as an addition to the current methodologies, a more systematic framework for evaluating and ranking underground transmission cable asset renewal investment projects based on the modelling of uncertainties and on determining the relative importance of a particular transmission line circuit in the power system as it affects the bulk power system reliability.
  • Keywords
    electricity supply industry; underground cables; underground transmission systems; bulk power system reliability; current asset management methodologies; power electric utility companies; transmission line circuit; underground transmission cable asset renewal investment projects; underground transmission cable renewal projects; Companies; Power cables; Power system reliability; Reliability; Uncertainty; Asset Management; Best Practices; Power System Reliability; Uncertainty Modeling; Underground Transmission Cables;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electrical and Computer Engineering (CCECE), 2014 IEEE 27th Canadian Conference on
  • Conference_Location
    Toronto, ON
  • ISSN
    0840-7789
  • Print_ISBN
    978-1-4799-3099-9
  • Type

    conf

  • DOI
    10.1109/CCECE.2014.6900973
  • Filename
    6900973