M25 controlled motorway - results of the first two years
Author
Harbord, Brian
Author_Institution
Highway Agency, UK
fYear
1998
fDate
21-23 April 1998
Firstpage
149
Lastpage
154
Abstract
A pilot of a \´controlled motorway\´ has operated on the southwest quadrant of the M25, the London orbital motorway since August 1995. The concept behind the pilot was that by controlling the speed of traffic at times of heavy flow, flow breakdown might be delayed or prevented, resulting in a reduction in accidents, an increase in "driver comfort" and possibly an increase in throughput over the controlled section. This paper describes the monitoring and assessment of the scheme, undertaken by the Highways Agency and its contractors, and summarises the results obtained over the first two years of operation.
Keywords
monitoring; road traffic; signalling; traffic control; London orbital motorway; M25 controlled motorway; MIDAS systems; monitoring; pilot; road traffic; signalling; traffic control; traffic speed control;
fLanguage
English
Publisher
iet
Conference_Titel
Road Transport Information and Control, 1998. 9th International Conference on (Conf. Publ. No. 454)
ISSN
0537-9989
Print_ISBN
0-85296-701-2
Type
conf
DOI
10.1049/cp:19980173
Filename
683650
Link To Document