• DocumentCode
    2400591
  • Title

    Advanced effective dispatching method for 300mm Twin-Phase Twin-Fab

  • Author

    Chang, Cheng-Sheng ; Lo, Hsi-Lo ; Pan, Cheng-Chung ; Wu, De-Lung

  • Author_Institution
    Rexchip Electron. Corp., Taichung, Taiwan
  • fYear
    2009
  • fDate
    10-12 May 2009
  • Firstpage
    76
  • Lastpage
    79
  • Abstract
    To establish a 300 mm-wafer large-scale Fab a lot of time and a large investment is needed. In order to reduce periods of Fab from construction to the actual manufacturing and make resource more efficient, we divided our Fab into 2 phase full line Fab called Twin-Phase Fab. Because we currently have 300 mm Twin-Phase Twin-Fab now, dispatching is more complicated. We develop an advanced RTD (Real-Time Dispatching) system to assist our manufacturing to face complicated dispatching issues. This advanced RTD system has been implemented into one 300 mm Fab and proved to enhance waiting-time difference from 2.4 hours to 0.9 hours. The number of inefficient cross-phase transfer also decreased by 92%.
  • Keywords
    production engineering; wafer-scale integration; advanced effective dispatching method; advanced real-time dispatching system; size 300 mm; time 2.4 hr to 0.9 hr; twin-phase twin-Fab; Dispatching; Investments; Large-scale systems; Logic; Manufacturing; Materials handling; Production; Real time systems; 300mm; Automation; Real-time Dispatching; twin-Fab; twin-phase;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Advanced Semiconductor Manufacturing Conference, 2009. ASMC '09. IEEE/SEMI
  • Conference_Location
    Berlin
  • ISSN
    1078-8743
  • Print_ISBN
    978-1-4244-3614-9
  • Electronic_ISBN
    1078-8743
  • Type

    conf

  • DOI
    10.1109/ASMC.2009.5155957
  • Filename
    5155957