• DocumentCode
    2400649
  • Title

    40% cycle time improvement as a result of continuous improvement activities

  • Author

    Janke, Bernd ; Kuschereitz, Uwe

  • Author_Institution
    Qimonda Dresden GmbH & Co. oHG, Dresden, Germany
  • fYear
    2009
  • fDate
    10-12 May 2009
  • Firstpage
    91
  • Lastpage
    93
  • Abstract
    This paper describes an ongoing lean transformation in a Qimonda 300 mm Frontend Wafer-FAB, resulting in a 40% cycle time reduction so far. Chip delivery at higher reliability, decreased costs by waste reduction, shorter time to market and faster yield learning by shorter learning cycles are the major outcomes of the project. Key to success was the coordinated, orchestrated effort, involving all contributing functional areas at the site. Strong performance measures were introduced, which are followed up in the continuous improvement process.
  • Keywords
    product development; semiconductor device manufacture; semiconductor device reliability; Qimonda Frontend Wafer-FAB; chip delivery; continuous improvement activities; product development; semiconductor frontend manufacturing; waste reduction; Constraint optimization; Continuous improvement; Costs; Lean production; Manufacturing industries; Product development; Semiconductor device manufacture; Semiconductor device measurement; Time to market; Waste reduction;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Advanced Semiconductor Manufacturing Conference, 2009. ASMC '09. IEEE/SEMI
  • Conference_Location
    Berlin
  • ISSN
    1078-8743
  • Print_ISBN
    978-1-4244-3614-9
  • Electronic_ISBN
    1078-8743
  • Type

    conf

  • DOI
    10.1109/ASMC.2009.5155960
  • Filename
    5155960