DocumentCode :
2401329
Title :
Reducing set-up times for improved flexibility in high-mix low-volume electric drives production
Author :
Fritsche, Ronny
Author_Institution :
Manuf. & Remanufacturing Technol., Univ. of Bayreuth, Bayreuth, Germany
fYear :
2011
fDate :
28-29 Sept. 2011
Firstpage :
74
Lastpage :
77
Abstract :
Today´s business environment increasingly requires the capability of producing electric drives in smaller lot sizes in order to be able to respond quickly to changing customer demands without suffering from large stocks, excess capacities or challenging the company´s ability to deliver. This flexibility is a crucial element of success for both, an increased customer service as well as a lean and competitive production system. A key enabler for achieving flexibility and implementing lean production is the reduction of set-up times.
Keywords :
customer services; electric drives; lean production; competitive production system; customer demands; customer service; high-mix low-volume electric drives production; lean production; set-up times; Companies; Context; Manufacturing; Optimization; Production; Systematics; Windings; Electric drives production; SMED; set-up time reduction; winding;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electric Drives Production Conference (EDPC), 2011 1st International
Conference_Location :
Nuremberg
Print_ISBN :
978-1-4577-1371-2
Type :
conf
DOI :
10.1109/EDPC.2011.6085553
Filename :
6085553
Link To Document :
بازگشت