• DocumentCode
    2407854
  • Title

    Identifying the task dependence in computer supported large scale collaborative manufacturing via E-CARGO model

  • Author

    Xu, Bin

  • Author_Institution
    Coll. of Comput. Sci. & Inf. Eng., Zhejiang Gongshang Univ., Hangzhou, China
  • fYear
    2009
  • fDate
    15-16 May 2009
  • Firstpage
    97
  • Lastpage
    100
  • Abstract
    Task dependence identification will benefit collaborative manufacturing in reducing the process coordination and materials or semi-manufactured product transfer delay between different process steps. However, in large scale collaborative manufacturing, it is hard to determine the task dependence as there are multiple products and lots process steps should be done for each product. This paper presents yet a new method to identify the task dependence in computer aided collaborative manufacturing through E-CARGO model. Process steps and product are described in the model and the relationship between different process steps can be easily identified. A case study is demonstrated for the adoption of this method.
  • Keywords
    computer aided manufacturing; goods distribution; groupware; E-CARGO model; computer supported large-scale collaborative manufacturing; process coordination reduction; semimanufactured product transfer delay; task dependence identification; Collaboration; Collaborative work; Computer aided manufacturing; Delay; Job shop scheduling; Large-scale systems; Manufacturing automation; Manufacturing processes; Supply chains; Virtual manufacturing; E-CARGO model; Task dependence identification; large scale collaborative manufactoring;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Mechatronics and Automation, 2009. ICIMA 2009. International Conference on
  • Conference_Location
    Chengdu
  • Print_ISBN
    978-1-4244-3817-4
  • Type

    conf

  • DOI
    10.1109/ICIMA.2009.5156569
  • Filename
    5156569