DocumentCode
2409355
Title
Improvement of Time Parameter Calculation Models for the Multi-Dependency Network
Author
Hongxiang Ouyang ; Yinghui Jian
Author_Institution
Bus. Sch., Hohai Univ., Nanjing, China
fYear
2010
fDate
7-9 May 2010
Firstpage
4121
Lastpage
4123
Abstract
The complexity of the existing time parameter calculation methods limits its wide-spread use for the multi-dependency network. Aimed at the above shortcoming, this paper develops a new conception which is overlap time difference on the basis of the study on the relationship between two activities, and then the multi-dependency network is transformed into activity-on-network in broad sense. Forwardly, the paper also presents corresponding time parameter calculation steps and formulas which reduce calculation works greatly. Finally, the effectiveness of the new methods is tested and verified by an example.
Keywords
architecture; construction; activity-on-network; multi-dependency network; time parameter calculation models; Complexity theory; Construction industry; Educational institutions; Presses; Project management;
fLanguage
English
Publisher
ieee
Conference_Titel
E-Business and E-Government (ICEE), 2010 International Conference on
Conference_Location
Guangzhou
Print_ISBN
978-0-7695-3997-3
Type
conf
DOI
10.1109/ICEE.2010.1035
Filename
5591332
Link To Document