• DocumentCode
    2409355
  • Title

    Improvement of Time Parameter Calculation Models for the Multi-Dependency Network

  • Author

    Hongxiang Ouyang ; Yinghui Jian

  • Author_Institution
    Bus. Sch., Hohai Univ., Nanjing, China
  • fYear
    2010
  • fDate
    7-9 May 2010
  • Firstpage
    4121
  • Lastpage
    4123
  • Abstract
    The complexity of the existing time parameter calculation methods limits its wide-spread use for the multi-dependency network. Aimed at the above shortcoming, this paper develops a new conception which is overlap time difference on the basis of the study on the relationship between two activities, and then the multi-dependency network is transformed into activity-on-network in broad sense. Forwardly, the paper also presents corresponding time parameter calculation steps and formulas which reduce calculation works greatly. Finally, the effectiveness of the new methods is tested and verified by an example.
  • Keywords
    architecture; construction; activity-on-network; multi-dependency network; time parameter calculation models; Complexity theory; Construction industry; Educational institutions; Presses; Project management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    E-Business and E-Government (ICEE), 2010 International Conference on
  • Conference_Location
    Guangzhou
  • Print_ISBN
    978-0-7695-3997-3
  • Type

    conf

  • DOI
    10.1109/ICEE.2010.1035
  • Filename
    5591332