• DocumentCode
    2411209
  • Title

    Practices related to internal and cross-border congestion management

  • Author

    Purchala, Konrad ; Shinkai, Masaya ; Regairaz, François

  • Author_Institution
    Katholieke Univ., Leuven, Heverlee
  • fYear
    2005
  • fDate
    7-7 Oct. 2005
  • Firstpage
    1
  • Lastpage
    8
  • Abstract
    This paper is based on the survey conducted by the Working Group C5-4 on congestion management. First it describes various market conditions and institutional arrangements in the 18 countries participating in the survey. Then, internal and cross-border congestion management in these countries are presented. The interaction with the electricity market is discussed, considering allocation of transmission capacity, market schedule, congestion management tools and payment for the costs incurred. The survey shows that there is a tendency towards the use of market-based methods. Coordinated market-based measures seem to be the most effective. For the time being however, few systems have experiences with it
  • Keywords
    power markets; power system management; Working Group C5-4; cross-border congestion management; electricity market; institutional arrangements; internal border congestion management; market conditions; market schedule; market-based measures; transmission capacity allocation; Africa; Australia; Contracts; Coordinate measuring machines; Costs; Electricity supply industry; Energy management; Frequency; ISO standards; Scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    CIGRE/IEEE PES, 2005. International Symposium
  • Conference_Location
    New Orleans, LA
  • Print_ISBN
    0-7803-9191-8
  • Type

    conf

  • DOI
    10.1109/CIGRE.2005.1532719
  • Filename
    1532719