DocumentCode :
2414687
Title :
Designing prefabricated substation buildings according to GOST standards
Author :
Hazel, Terence ; Norris, Alain ; Barbizet, Michel ; Safin, Rafic
Author_Institution :
Schneider Electr., Grenoble, France
fYear :
2002
fDate :
2002
Firstpage :
251
Lastpage :
259
Abstract :
Prefabricated electrical substation buildings were chosen for supplying power to the pipeline linking the oil producing regions of the Caspian Sea to a new port facility on the Black Sea. All electrical equipment was required to be in compliance with the standards and regulations of the Russian Federation and Kazakhstan. This added to the complexity of the design, construction, commissioning and operation of the equipment and systems. The paper describes some of the difficulties that occurred, and the solutions implemented when applying local regulations and in obtaining GOST-R and GOST-K certification from the Russian Federation and Kazakhstan.
Keywords :
oil technology; power system planning; standards; substations; GOST standards; GOST-K certification; GOST-R certification; Kazakhstan; Russian Federation; commissioning; construction; local regulations; oil pipeline power supply; prefabricated electrical substation buildings design; standards compliance; Buildings; Certification; Code standards; IEC standards; Petroleum; Pipelines; Prefabricated construction; Production; Region 8; Substations;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Petroleum and Chemical Industry Conference, 2002. Industry Applications Society 49th Annual
ISSN :
0090-3507
Print_ISBN :
0-7803-7384-7
Type :
conf
DOI :
10.1109/PCICON.2002.1045009
Filename :
1045009
Link To Document :
بازگشت