• DocumentCode
    2419923
  • Title

    The impact of drying and oil impregnation conditions and of temperature cycles on the clamping force of power transformer windings

  • Author

    Krause, Ch. ; Goetz, W. ; Heinrich, B.

  • Author_Institution
    Weidmann TBS, Switzerland
  • fYear
    2002
  • fDate
    7-10 Apr 2002
  • Firstpage
    350
  • Lastpage
    353
  • Abstract
    This study reports on the effect of processing conditions on the static clamping force of transformer windings and on the variation of the clamping force with time. Small scale disc winding models were submitted to various drying and oil impregnation procedures, as well as different clamping and temperature conditions. The results confirm the importance of properly controlled processing parameters. Furthermore, the impact of time, and of temperature variation as they typically occur at load cycles, was investigated. Significant change of the clamping force was observed, which means that the static force deviated considerably from the value as set initially, prior to oil impregnation. Even within a short period of 10 days, a slight overall decrease of the clamping pressure was measured.
  • Keywords
    drying; electric breakdown; force; impregnated insulation; insulation testing; power transformer insulation; power transformer testing; thermal analysis; transformer oil; transformer windings; 10 day; clamping conditions; disc winding models; drying effect; load cycles; oil impregnation; power transformer windings; processing conditions; static clamping force; temperature conditions; Assembly; Circuit testing; Clamps; Conductors; Oil insulation; Petroleum; Power transformer insulation; Power transformers; Temperature sensors; Windings;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electrical Insulation, 2002. Conference Record of the 2002 IEEE International Symposium on
  • Print_ISBN
    0-7803-7337-5
  • Type

    conf

  • DOI
    10.1109/ELINSL.2002.995948
  • Filename
    995948