Title :
Two-echelon supply chain inventory model with shortage, optimal reorder point, and controllable lead time
Author :
Hidayat, Y.A. ; Suprayogi ; Liputra, D.T. ; Islam, S.N.
Author_Institution :
Dept. of Ind. Eng., Bandung Inst. of Technol. (ITB), Bandung, Indonesia
Abstract :
This paper considers a two-echelon supply chain inventory problem consisting of a single-supplier and a single-buyer. In the system under discussion, the supplier produces a product and supplies it to the buyer facing a stochastic demand condition. Buyer´s lead time is controllable that can be shortened at an added cost. In addition, all shortages are backordered. A model is formulated for an integrated supplier-buyer problem to simultaneously determine the optimal order quantity, reorder point, lead time, and the number of shipments from the supplier to the buyer during a production cycle. The objective function is to minimize the total expected cost of the system. An algorithm is developed to obtain the optimal solution and a numerical example is also included to show the results of the proposed model.
Keywords :
cost reduction; inventory management; supply chain management; controllable lead time; optimal order quantity; optimal reorder point; production cycle; shortage; single-buyer; single-supplier; stochastic demand condition; total expected cost minimization; two-echelon supply chain inventory model; Computer crashes; Joints; Mathematical model; Safety; Standards; Supply chains; Controllable lead time; optimal reorder point; supplier-buyer integrated system;
Conference_Titel :
Management of Innovation and Technology (ICMIT), 2012 IEEE International Conference on
Conference_Location :
Sanur Bali
Print_ISBN :
978-1-4673-0108-4
DOI :
10.1109/ICMIT.2012.6225798